The LEneo OEM Compact electrode humidifier is designed for perfect integration into an air treatment system: computer cabinet, recycler for Data Center, Air handling unit eg.
Description : Electrodes steam boiler 6 kg/h single phase - LEnéo OEM C 6 M
The LEneo OEM Compact 6 kg / h Submerged Electrode Humidifier is designed to minimize clutter and facilitate installation in small spaces with its wall mounting plate.
The kit includes the machine body with reduced dimensions with drain pump, filling solenoid valve, hydraulic system, cleanable steam cylinder and control electronics.
The electronic control is separate and can be installed on a switchboard.
The LEneo OEM Compact 6 kg / h humidifier is particularly suitable for air handling units and all applications where space and industrialization are required.
Key Features: b>
• Stainless steel support frame with wall mounting.
• Fast electrical connector for removing the steam cylinder.
• Cleanable steam cylinder that can be easily replaced with steel electrodes, cylinder bottom anti-scaling filter, maximum water level sensor and quick-connect electrical connections.
• Filling solenoid valve.
• Resistant and reliable drain pump.
• Steam cylinder for low conductivity water (minimum conductivity limit 125 μs / cm).
• Separate electronic control for installation in the control cabinet with an integrated display (optional remote control).
• Management of a second Relative Humidity Limit sensor to prevent condensation in air duct.
• Management up to 6 devices in master / slave structure to reach 144 kg / h.
• Caution: The kit does not include the power contactor, terminal blocks and wiring.
Electronic Order: b>
The electronic microprocessor controller TEDDY STEAM allows extremely careful control and configuration of the device. Thanks to the many variables available, it is indeed possible to customize the operation of the humidifier according to the specific requirements of the customer.
• Several commands available: All-Or-Nothing by external contact, proportional with connected HR probe (option), proportional by external 0-10V signal, All-or-None by NTC probe connected (option), Modbus.
• Management of a second H.R. high sheath limit probe.
• Optimized use for the Hammam thanks to the integrated temperature control, gasoline management, control of the blower and extraction fan.
• Proportional adjustment of steam flow from 20% to 100%.
• Maximum steam flow reduction via the digital input or via the display.
• Automatic emptying out of use.
• Operating hour counter.
• Management of the maximum water level sensor.
• Wide-screen control consoles and status icon for reading and programming work data remotely controllable up to 100 meters with a single telephone cable.
• Diagnosis to locate problems or the need for maintenance.
• RS485 connection with Modbus protocol.
Technical Data : Electrodes steam boiler 6 kg/h single phase - LEnéo OEM C 6 M
General Characteristics | |
---|---|
Power | 4.5 kW |
Steam output | 6 kg/h |
Electrical supply | 230 V (Ph+N) |
Frequency | 50-60 Hz |
Full load Current | 19 A |
CE Approval | Yes |
Manufacturer warrantly | 2 years |
Dimensions and Weights : | |
Height | 400 mm |
Width | 275 mm |
Depth | 230 mm |
Service Weight | 9 kg |
Emphy weight | 6 kg |
Water and Drain Connections : | |
Water Connection | 3/4" M |
Drain Outlet | DN 32 |
Steam outlet | DN 25 |
Water Supply : | |
Type | Tap water |
Conductivity | 250 - 1300 µs/cm |
Hardness | 160 - 450 mg/l CaCO3 |
Supply Pressure | 1 - 10 bars |